|
 |
 |
 |
|
| |

» 1.
Construction of the Hospital at Punakha (phase I)
Ward with 30 beds, operation theater, X-ray dept., laboratory, dental
dept., department for traditional Bhutanese medizin, personnel quarters,
auxiliatory buildings
» 2.
Construction of the Training Centre for Technical-Medical Staff
at Punakha
accomodation for 24 trainees and 2 tutors, class rooms
» 3.
Extension of the Punakha Hospital (phase II)
construction of a policlinic, a second ward with 20 beds, a building
for maintenance-storage, a small building for religious rites for
deceased
» 4.
Elaboration and execution of Master Plan for rehabilitation of National
Institute for the Disabled (blind children) in Khaling
construction of 2 hostels for blind girls and boys, kitchen house,
dining hall
» 5.
Construction of the first “School for Hearing-impaired ( deaf-mute)
Children with Hostels
for Girls and Boys” in Drukyel near Paro
2 buildings for class rooms, 2 hostels ( girls and boys), house for
tutor
» 6.
Re-construction of the roofed Cantilever Bridge at Punakha
crossing the Mochhu (Mo-River) and connecting Punakha village and
the Punakha Dzong in adapted traditional Bhutanese architecture
» 7.
Secondment of German doctors to our Hospital at Punakha
Dr. med. Martin Joos, Dr. med. Johannes Meixner
» 8.
Other secondments of personnel
Andreas Guggemoos and Arnim Geißler as technical volunteers,
medical technician Mrs. Lilo Schulze, student of medicine Samuel Christen,
laboratory technician Karma Wangchuck
» 9.
New Projects
|
|











|
|